Homeowner checklistPlanning a continuous exterior insulation retrofit
Use these steps to plan, check and keep a record of your next actions.
Home / equipment: __________________Date: __________________
- Have the existing wall layers verified before choosing exterior insulation.
- Request opening and edge details connecting insulation, air sealing and drainage.
- Ask what thermal bridges and drying limits remain after the work.
- Confirm responsibility for cladding attachments and concealed inspections.
- Keep the drawings, progress photos and ventilation verification with the home records.