Homeowner checklistGarage workshop power: plan the work before the panel
Use these steps to plan, check and keep a record of your next actions.
Home / equipment: __________________Date: __________________
- List workshop tools and other loads likely to run together.
- Request a load assessment before selecting feeder or panel capacity.
- Confirm circuit, protection and connection requirements for each machine.
- Plan lighting, access and inspection before wiring is concealed.
- Keep permits, circuit identification and commissioning records.